Kirkby Diamond opens doors for launch of power cable hub

January 23, 2025

A major reconfiguration of a warehouse has enabled one of Europe’s leading suppliers of power cables to launch a new hub in Bedfordshire.

Our building consultancy team led the £800,000 project at Priory Point in Bedford Business Park.

Ellesmere Property Management Company, landlord of the 90,000 sq ft warehouse, instructed our team to deliver the construction of two new dock levellers, which bridge the gap between the building and the vehicle, facilitating a secure platform for the loading and unloading of goods.  This was required ahead of new occupier Premier Cables moving in after agreeing a 10-year lease, in a deal completed by our Agency department.

Grant Whittaker, building consultancy associate at Kirkby Diamond, led the project team including structural engineers, architects, utility services and M&E contractors.

Grant said: “This was our team’s largest project to date and we are very satisfied with the outcome, which has enabled Premier Cables to launch a new hub in the heart of Bedfordshire. 

“When the previous tenant’s lease was coming to an end, we were instructed to carry out the dilapidations survey for our client and then our agency team found a new tenant. The landlord agreed to have the dock levellers installed because they were essential for the new tenant’s operations.

“As part of the deal, the incoming tenant needed several alterations to the existing building and the landlord had a plan that they wanted us to implement. We understood what the client wanted to achieve and, with support from a range of professionals, submitted plans to building control to ensure the local authority approved the plans.”

Ash Construction, the principal contractor, built the two new dock levellers. On site for 11 weeks, work included demolition of a plant room and one side of the building, excavation of the concrete floor, installation of new leveller doors and restoring the rear of the warehouse.

"The timetable was challenging, said Grant. The new tenant needed to start fit out of the new warehouse and had a set move in date. Racking was being installed while heavy civil engineering work was being carried out to one section of the building. Stock has now been moved in and the company has taken full occupation."

Mark Pepper, executive partner and head of building consultancy, said: “Our team is thrilled with the result at Priory Point. This was a heavy refurbishment with a significant amount of building work involved and we delivered an outstanding result for our client. I would urge landlords and tenants to get in touch if they are looking for support on similar large-scale projects.”

A time lapse video of the project can be viewed here:

 

Grant Whittaker

BSc (Hons), MRICS / Associate

email grant.whittaker@kirkbydiamond.co.uk phone 01908 678 800

Mark Pepper

BSc (Hons), MRICS / Executive Partner

email mark.pepper@kirkbydiamond.co.uk phone 01582 738 866

Kirkby Diamond opens doors for launch of power cable hub

Dilapidations and Refurbishment at Unit 8 Torc MK

Dilapidation and Refurbishment works at Unit 8 Acre Road | Reading

Occupier Service Success in Milton Keynes